Ken Mattingly was moved in the guidance crew into parallel coaching with Anders as backup CMP just in case Apollo 11 was delayed previous its supposed July start day, at which position Anders could be unavailable.[59] On arrival within the Vertical Assembly Building, Every single phase was inspected inside https://low-power-mcu76307.life3dblog.com/32878099/detailed-notes-on-apollo-4-plus