As viewed in the figure underneath, continual auger is used to drill the borehole, carry up drilled soil, and pour concrete though the auger is moved up. Due to this fact, the borehole does not have to have casing or hydrostatic pressure to forestall damage to the borehole wall. Demolition https://garrisonc702kry2.wikimidpoint.com/user