The main park incorporates a capability of two hundred MW while Sandrini II includes a capacity of 100 MW. The entire price of both of those initiatives weren't disclosed nevertheless, through building, more than 200 employees had been used. The tasks are anticipated to see A few positions opening up https://certifiedteslainstaller.blogspot.com/2024/08/how-to-find-best-california-solar.html